Sunday 1 June 2014

Update June 2 - lots of pics!

So, I've been crazy busy packing and preparing and not blogging!

We love the tiling so far. We love the paint colour - its stonebridge, and the electricians have done a great job at the small amount of work they have done! One of my first changes will be changing the white power points on the blackglass splash back to black.

So here are some pics! After all, thats what we all want to see right?
Firstly the tiling in bathrooms, laundry, patio and terrazzo! They look fantastic.

kids bathroom
 My ensuite shower before grouting
 Kids bathroom before grout
 kids shower with grout
 Kids basin
Feature wall in ensuite
 Laundry
 Terazza
 Patio
Then the painters arrived - they were around for six days or so, after that the electricians were there! There has been a misunderstanding and at this point most of our lights have not been installed - we are working to rectify this. My advice would be to get EVERYTHING written down. The crappy three lines in our tender is useless. We have wiring that there is no mention of anywhere - why would we have wiring that has not been discussed or paid for? Our argument is that it was drawn into the diagram but not written down in words. And why would we ask for wiring but not install when we dint even know its an option! So now we need to find more money to get the lights installed!
Terazza
kids rooms all look like this
 hallway
 My gorgeous kitchen - with unfinished lighting!
 Main bedroom
 Living room
 This will become our linen
 kids all have the same cupboard and door
 Bathroom ixl!